Which of the following is considered a major process flow structure?
a. Lean Manufacturing
b. Project
c. Fabrication
d. Lead Time

Respuesta :

frontloader13 frontloader13
  • 22-11-2015
Since lead time is the time period between the starting and completion of producing a product, lead time is a major process flow structure.
Answer Link

Otras preguntas

Assuming that the car was stolen prior to delivery to abc motors and without the knowledge of any representative of abc motors, what kind of title did abc motor
Although most thunderstorm cells complete their life cycle in 30 minutes, thunderstorm weather may persist at a specific location for 6 to 12 hrs or longer. exp
What was the best known league of trading tribal groups?
What factors led to the poor relations between Europeans and Native Americas in Virginia?
What tactic, eventually ruled illegal by the courts, did president nixon use to battle democratic programs that he opposed?
how much would $500 invested at 6% interest compounded continuously be worth after 5 years?
A 23-year-old patient comes to the emergency room after being physically assaulted by her boyfriend. she complains of nasal pain and bleeding from the left nost
Choose the point-slope form of the equation below that represents the line that passes through the points (−3, 2) and (2, 1). A. y + 3 = −5(x − 2) B. y − 2 = −5
HELP Compare the standard of living of Cuba with that of the United States in at least 3 to 5 sentences.
When parking downhill with a curb what steps would you follow with an automatic transmission?