__________ have a weakness of being difficult to follow when multiple paths exist, but __________ are more helpful in the hands-on task of managing the 1project.

Respuesta :

andriansp andriansp
  • 04-11-2017
the answer to this question is Gantt charts, networks
The gnantt cahrts is one of the most common method in arranging group schedules within a certain organization.
These charts usually includes several elements such as date of the project, budget flow, and persons that are in-charge for each projects
Answer Link

Otras preguntas

What combines to form compounds? A. atoms of elements B. molecules C. minerals D. valences
4. One tool for narrowing your topic is to _____.
in "the most dangerous game" the character of zaroff serves as a(n) ____ to the protagonist, sharply contrasting rainsfords personality.
Which of the following is not a process of a stream load a. suspension b. bed load c. divide d. materials in solution
What is (7m+5)^2 Simpler form of product
Which words in this sentence are an independent clause? Tide pools are depressions in rocks along the coastline that fill with seawater when the tide retreats a
who was the leader that introduced communism and central planning to the former Soviet Union?
Please answer these two questions precisely :) 1. using the expression 7x = 3y, if y is 35, what is x? a. 15 b. 21 c. 35 d. 105 2. Bruce has 97 sports cards. 34
California is located in which of the following two hemispheres?
choose the fraction that is equal to 3/4. A.3/8 B.6/12 C.9/16 D.6/8