If 5 workers can pave 10 driveways in 30 days, how many days would it take 20 workers to pave 38 driveways?

Respuesta :

musiclover10045
musiclover10045 musiclover10045
  • 25-07-2017

5*30/10 = 20x/38

150/10 = 20x/38 =

5700/200x=

x= 5700/200 = 28.5 days

Answer Link

Otras preguntas

- A store is located at P(50, -30). How long will it take a truck driving at 50 miles per hour to drive from warehouse N to this store?
ILL GIVE U BRAINLEST Moving at a constant rate, a trench machine is advertised as being able to dig 36-foot trenches in 40 minutes. A farmer uses the same machi
Ms. Smith allows her students to choose the mean, median, or mode of their set of test scores to be their final grade. Which measure of center should Erica use
A characteristic pattern of behavior or a disposition to feel and act is called a A. attribution B. defense mechanism C. style D. trait E. perspective
The Doppler Effect is caused by which of the following? Select all that apply… A - motion of the source B - the type of wave C - original frequency of the sour
How do stereotypes affect how YOU see yourself in the world?
A cold object will have_ kinetic energy which means _ faster moving particles
Help me with my Spanish
- У D 14x . A high-school band has d drummers and 10 violinists. There are 2 more violinists than drummers. Which of the following equations represents the situ
How have advancements in science, technology, mass communication and medicine changed the world? Provide at least three examples. In your opinion what was the s