wongankriMack wongankriMack
  • 25-03-2017
  • Business
contestada

When a company assigns the costs of direct materials, direct labor, and both variable and fixed manufacturing overhead to products, that company is using: product costing absorption costing operations costing variable costing?

Respuesta :

LassieBe15 LassieBe15
  • 27-03-2017
I would think it might be, "absorption costing."
Answer Link

Otras preguntas

When converting cotangent+5 into cos/sin do you do what I did and bring the 5 with them or do you do cos/sin +5?
true or false for the best control of both the accelerator and brake pedals rest the heel of your foot on the floor??
how do I solve this problem? mars rotates on its axis at the rate of . 2552 rad/hr how many hours are in a martian day?
Are there Centrioles in Nerve cells?
To make a ___________________ , position your car to the right side of the right lane. A. left turn B. left lane change C. stop for pedestrians D. rig
What is square root of 81
how many moles are in 9.8 grams of calcium?
Should I write countries' fuel or countries's fuel
5x^2+19x+12 factor the polynomial
What percent of 125 is 24