Tr2ipmariamClar Tr2ipmariamClar
  • 24-03-2017
  • Physics
contestada

A volume variance is the difference between overhead at maximum production volume and that at the budgeted production volume.
a. True
b. False

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 07-04-2017
The statement is not correct. Therefore, the answer is letter B. False. The actual definition of a volume variance is that it is the difference of the quantity consumed and the amount budgeted to be sold, the difference will furthermore be multiplied to the standard unit per price. 
Answer Link

Otras preguntas

The two algae seen here are classified as green algae. That means they make their own food by photosynthesis. The algae on the left is one-celled, or unicellula
Why did the Antifederalists oppose the new constitution? A. They believed it favored the more populous states. B. They believed it would give too much power t
Caroline started the day with 75 tickets at the fair. At the end of the day, the number of tickets she had was 32% less than what she started with. How many did
Report these questions using Wh- clauses
Find the value of x when 6 - 4x = 6x - 8x - 6 the value of x is ? need step by step
please help me this is from khan academy :(((
URGENT!A series of experiments are conducted with five different cups, each filled with the same amount of water. One cup is kept at room temperature (25 °C), w
The average swimming speed of a salmon is about 5 ft/s. If a salmon swims at this speed for a full minute, how far will the salmon travel?
what is the problem with not having any court system to settle disputes?
whatwrongin his view,with a treeless Nepal?​