Kayla7ptorwh Kayla7ptorwh
  • 25-02-2017
  • English
contestada

It took construction company 63 days to complete the buildings. how many weeks did it take ? 1 week = 7days

Respuesta :

violetblue
violetblue violetblue
  • 25-02-2017
so it took 9 weeks or 2 months and 1 week
Answer Link

Otras preguntas

A car accelerates uniformly from rest to a speed of 6.6 m/s in 6.5 s. Find the distance the car travels during this time.
y=x^(3/2) in terms of y
What is the width of a rectangle with an area of 5/8 inches squares and a length of 10 inches.
Which verb form correctly completes this sentence? Para llegar al sastre a tiempo, tú _______ que salir dentro de veinte minutos. a. tendría b. tendrías c. te
Leah Phil and cam collect a total of $200.30 for a holiday from Grazer will collect $12.80 more than Leah Chemical X 3 times as much as Leah how much does each
A band of very fast wind that is formed by the different temperatures between huge convection currents is called a (convection current, jet stream)
How did the cycle of economic dependence continue after independence?
How did roman law protect those accused of crimes?
The norman conquest brought the end of the anglo-saxon time period. true false
I know this is easy but what is 799 divided by 7