What is the first phase of the project process?


A. Monitoring


B. Pre-Planning


C. Implementation


D. Planning

Respuesta :

tif21076 tif21076
  • 06-05-2021

Answer:Pre-planning

Explanation:

Answer Link
zlskfrum zlskfrum
  • 06-05-2021

Answer:

Explanation:

Implementation and Monitoring are latter phases of a project.  Pre-planning goes before Planning so the answer is B.

Answer Link

Otras preguntas

The probability that Roberto throws a baseball in the strike zone on one pitch is 0.72. Roberto throws a baseball 3 times in a row. A. Create a probability dist
Simplify the expression 8x-5+2x
Two triangles with the same corresponding side lengths will be congruent is known as the
How old was lhamo thondup when he became the dalai lam?
what is the letter paul about
How to differentiate between adverbs and adjective phrases
Everyone has potential to be evil agree or did agree
the eighteen vertical columns of the periodic table are commonly referred to as ??
how to do a k over 8 equals 7
why is the concrete cycle not a true cycle like the rock cycle