jenneferquimbo jenneferquimbo
  • 22-04-2021
  • English
contestada

What part of the project plan that tells how you
project will look like when finished?​

Respuesta :

CoolReaper
CoolReaper CoolReaper
  • 22-04-2021
Project Scope
By defining the scope, the project manager can begin to show what the project's goal or finished product will look like at the end. Hope this helps! Mark brainly please!
Answer Link

Otras preguntas

what does dew point have to do with creating dragons breath PLEASE HELP!!!!!
Which is the difference of 21 1/4 - 18 2/4 A 2 1/4 B 2 2/4 C 2 3/4 D 3 1/4
Terry has between 50 and 100 pennies and her piggy bank. She can count them two at a time and come out even. She can also count them three and five at a time an
Laura earns 134,350 per year. Use Laura's income taxes rate too determine what her monthly deduction should be
Which part of the earth system contains continents?
What literary tool is Mark Twain using when he humorously describes the sadness, loneliness, and regret that Becky Thatcher feels after she and Tom quarrel and
Which man established a totalitarian regime in the Soviet Union? a.Joseph Stalin b.Francisco Franco c.Adolf Hitler d.Benito Mussolini
The circumference of a circular painting is 28.26 feet. What is the diameter of the painting? Use 3.14 for π, and do not round your answer.
Which sentence does not contain any punctuation errors? A. Miss Wallace, our babysitter, tried to open the pickle jar. B. Miss Wallace our babysitter, tried to
How can something as massive as the Pacific Plate move?