Respuesta :

subratswain3
subratswain3 subratswain3
  • 23-02-2021

Answer:

given 4bags of cement =18m2

1 bags of cement =18/4=4.5m2

7 bags of cement =7*4.5=31.5m2

Answer Link

Otras preguntas

Is tap water a heterogeneous or homogenous mixture? Explain your answer.
The industrial Revolution began in the late 1700s in: A. England's textile industry B. America's weapons industry C. Germany's steel industry D. England's coal
what is the point of view of The Wizard of Oz
Which of the following principles did the Founders use as part of the basis for the Constitution? a. unlimited state government b.strong federal government c.
if a male has a WHR greater than 1, he is considered to be at high risk for cardiovascular problems. Calculate the WHR of a male with a waist measurement of 40
What is 51.5% of 845 million
Which was not a reason Johnson used when vetoing the extension of the Freedmen's Bureau and the Civil Rights Bill of 1866?
A cat lifting a barbell of 2.5 kg a distance of 3 meters. How much work is done lifting the barbell? How much work is done if the cat holds the barbell over his
How do you say "you mean the world to me in german
How does a chemical equation express relationship between substance?