a field can be cleared by 33 men in 15days. how many more person required if the field has to be cleared 4 days earlier?​

Respuesta :

wsookhuei
wsookhuei wsookhuei
  • 24-10-2020

Answer:

12 men

Step-by-step explanation:

33men x 15 days = the whole project

Let the men that are required be x.

33 x 15 = (15-4)x

495 = 11x

x = 45

Answer Link

Otras preguntas

Why Is Missouri Called the Show-Me State?
To what extent did world war 2 effect women's daily lives?
What Is the Connection Between the Digestive System and Urinary System?
two erstwhile british colonies
A rectangle's length is three times its width.  Let w denote the rectangle's width.  What polynomial represents the rectangle's area?
What Was the Alaska Purchase?
6010 males did a survey and 59.7% choose vanilla how many choose chocolate
A physics lab group was conducting an experiment to determine the length of a spring when different objects of varying weight were hung from it. After testing t
A can of drink is in the shape of a cylinder. The can has a radius of 4cm and a height of 15cm. Calculate the volume of the cylinder. You must include the corre
To help you move, skeletal muscle is attached to