michellemorrison
michellemorrison michellemorrison
  • 23-04-2020
  • Mathematics
contestada

If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines

Respuesta :

2020hw
2020hw 2020hw
  • 23-04-2020

Answer:

60 workers

Step-by-step explanation:

4 machines= 12 workers

20 machines= 60 workers

You multiply by 5

Answer Link

Otras preguntas

The national government has 3 basic types of powers: ___, implied, and inherent
HAEMON: Your gaze makes citizens afraid—they can’t say anything you would not like to hear. But in the darkness I can hear them talk— the city is upset about th
Is 0.013 more or less than halfway between 0.01 and 0.02 . how do u know
When two systems in contact are not at the same temperature, _____ occurs. heat flow expansion evaporation friction
1•2•3•.....•2015.please help
I do not understand this problem
Calculate the water pressure in the pipes at the bottom if a high –rise building that is fed by reservoir 60 m above the roof top
The equation of line m is 3x−5y=−4 What is the slope of a line that is perpendicular to line m? Is it -5/3 ?
Which heroic characteristics help Perseus defeat Medusa? Check all that apply
Because it is unsecured ________ bonds are risky and have higher return rates than secured bonds A. Eurobond B. Convertible C. Mortgage D. Debenture