aaliyahgbnl2002
aaliyahgbnl2002 aaliyahgbnl2002
  • 25-03-2020
  • Arts
contestada

What was the role of master builder?

Respuesta :

yusra33khatab
yusra33khatab yusra33khatab
  • 25-03-2020

Answer:

Master builders were responsible for the design, survey, engineering, and management of the construction. In other words, the head builder would be the architect, engineer, and superintendent for each project, Master builder project delivery system and designer construction knowledge

Answer Link

Otras preguntas

Distinguish between pure and applied science.
Find the midpoint of CD. C= (7,-4) and D= (-8,-5)
I need help with this question
Can someone give me tips on writing better? And more professional
find the sum of 3x + 2,5x- 7 and - 3 + 2x ​
What is a central idea of the Newsela article "Rickie Fowler and the Walk of a Lifetime
Evaluate the expression:
Lee y escoge la opción con la forma correcta del verbo en el condicional para completar la frase. Read and choose the option with the correct form of the verb i
Applications of micro-organisms. .Help on this plz grade 10 science
Jasper kept track of the trick-or-treaters who came to his door and found that 1/4 were dressed as ghosts and 5/12 were dressed as witches. What fraction of the