thedude83 thedude83
  • 26-03-2019
  • Business
contestada

which is a result of frequent change request from client ​

Respuesta :

MsTeel
MsTeel MsTeel
  • 28-03-2019

This can result in delays and higher costs.

A change order is a request from a client during a project to alter or change various aspects of the project. While you should plan and account for some changes in advance, excessive changes can add more costs and time to the task.

Answer Link
lovelaceboys4
lovelaceboys4 lovelaceboys4
  • 13-10-2019

Answers:A.end user resistance

B.quality issues

C.lack of documentation

D.project completion constraints

WHICH ONE

Answer Link

Otras preguntas

lincoln only freed the slaves in certain states through the emancipation proclamation - which states were these?
Fractional reserve banking means banks hold on to only a small fraction of the deposits they receive, loaning out the rest. This type of system will fall apart
Find the number that makes the ratio equivalent to 45:15. :3
BRAINLIEST AND THE POINTS FOR BEST AND NON-COPIED ANSWER, Please label with each year
What is the equation used to calculate the density of a material?
How would you work with different learning levels in the classroom?
why do we need to preserve our flok songs​
BRAINLIST!!!!!Julius needs to determine how much information needs to be given about an isosceles triangle to be able to draw an isosceles triangle. He is looki
Solve the inequality for v. 40 ≤ 4v please will mark brainiest.
What is the answer ?