A construction company can remove 2/3 tons of dirt from a construction site each hour . how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Americ
Americ Americ
  • 22-06-2018
Set up a ratio to compare the two proportions.

x= number hours to remove 30 ton


(2/3 ton)/ 1 hour= (30 ton)/(x hours)
cross multiply

(2/3)(x)= (1)(30)

2/3x= 30
divide both sides by 2/3

x= 30 ÷ 2/3
to divide by fraction, multiply by reciprocal of 2/3

x= 30 * 3/2
multiply numerators

x= (30*3)/2

x= 90/2

x= 45 hours


ANSWER: It will take 45 hours to remove 30 tons of dirt.

Hope this helps! :)
Answer Link

Otras preguntas

If a plant cell completes the cell cycle in 24 hours, how many plants cells will be produced in a week? (With explanation)
7j+8s=455 what do j and s equal?
What is equilibrium pls answer i know but need to confirm
When a wave is too steep to support itself, the wave front collapses creating a ________ that advances up the shoreline.
An electon in a box absorbs light. The longest wavelength in the absorbtion spectrum is 700 nm . How long is the box
Explain the marco relationship for a strength athlete vs an aerobic athlete.
ryan bought a wii game for 34.00 at the mall. he had to pay 6 % sales tax. How much did he pay in all
The meaning of the term child marriage and state two reasons why child marriage is still prevalent
A kid on a skateboard is halfway down a hill. If he has 500J of kinetic energy, what is the total energy in the system, his potential energy and his kinetic ene
what is lim x -> 7 ... (see image)