katiegresham2381 katiegresham2381
  • 22-03-2024
  • Business
contestada

Expected demand during a lead time = 570 kg Standard deviation of demand during a lead time = 52 kg Demand during a lead time is distributed Normally Acceptable stock.
a. True
b. False

Respuesta :

Otras preguntas

Can someone help with this please??​
What is the balanced equation for the combustion of magnesium?
PLEASE 10pts Which elements of an argument do these two passages share? Select three options. the same claim the same purpose a call to action an appeal to emo
Write the expression in complete factored form. 2u(p + 7) + 3(p + 7) =
which is the graph of the function f(x)=2x^3-7x^2+2x+3​
what is the Product of x-3 and x-9​
2. Which of the following effects of vog on humans is NOT mentioned in the passage? A. irritated eyes B. throwing up C. coughing D. sore throats
Where did Osiris go?
A hammer slides down a roof that makes a 30.0°angle with the horizontal. What are the magnitudes of the components of the hammer's velocity at the edge of the
If G is the centroid of triangle ACE, AG = 26, BC = 44, DG = 12, find each missing measure