cvillalpando812 cvillalpando812
  • 24-09-2022
  • Mathematics
contestada

A fiber optic cable company is installing cable along a road 6 1/2 miles long. The crew takes a day to install each 1/4 mile of cable. How many days will the installation take?

A fiber optic cable company is installing cable along a road 6 12 miles long The crew takes a day to install each 14 mile of cable How many days will the instal class=

Respuesta :

Otras preguntas

The melting point of table salt is 801 degrees C. Is this a physical or chemical property?
Cell structures that plant and animal cells don't share are _____.
As a leader of florence cosimo de medici was best characterized as a
The duty of a journalist is to give honest facts to the readers. How is the common man affected by ‘Yellow Journalism’.
A biology class has a total of 47 students. The number of females is 9 less than the number of males. How many males and how many females are in the class?
what problems have resulted from the dramatic increase population over the last 100 years?
What is 40 plus 1 please
A store is selling sculptures. The first week, it prices 6 sculptures at $80 each. After each week, if a sculpture is not sold, it will be priced to sell for 0.
Write a fraction that is equivalent to a terminating decimal between .5 and .75
if the ribbon cost $0.10 per foot what is the total cost of the ribbon in dollars